Integrity Dig
Client: Enbridge
Project Value: $3,400,000
Project Schedule: July – October 2022
During a recent ILI data run, it was determined that 3 welds on the lower half of the south side valley slope of the Sikanni River needed to be assessed for continued fitness for service.
This project scope included:
- Installation of 5km of access, which included installing an 80’ bridge.
- Completion of 3 steel slope integrity digs.
- Inspection and installation of sleeving at each girth weld.
- Use of specialized steep slope equipment.