Dunkley (Dunkley), CS5 (Quesnel), and CS2 Crossovers (Chetwynd) located

Pipeline Replacement

Client: Enbridge 

Project Value: $3,537,000.00 

Project Schedule: May – October 2025 

The project scope included:

  • Replaced the NPS 30 valve assembly, receiver and NPS 10 blowdown piping assembly at the KP 90.6 Compressor Station 5 (CS5), KP 30.1 Dunkley crossover valve, and the KP19.7 crossover.
  • NPS 30 valve and associated piping installed, along with the replacement of the NPS 10 riser, NPS 10 blowdown spools and NPS 12 crossover spools.
  • The new assembly supported by the installation of two structural steel supports and new concrete foundations.