Pipeline Replacement
Client: Enbridge
Project Value: $750,000
Project Schedule: 2019
A ripple was discovered at 6BL1 KP80.6 during planning for a pipe replacement outside and subsequent to EMAT ILI. This section of pipe happen to be located under the road and would not pass the loading assessment due to metal loss/corrosion features. OMH was asked by Enbridge to assist in replacing 80m of pipeline.
The scope consisted of:
- Pipe hauling, bending, removal and replacement of NPS 30” pipe.
- Mobilization to site.
- Pre-tie-in excavation and NDE.
- Pipe bending and subsequent delivery.
- Welding at site, including hydrotest preparation.
- Cut-out activities.
- Demobilization.