Deadman Cutout Pipeline Replacement, Savona, BC
Pipeline Replacement

Client: Enbridge

Project Value: $750,000

Project Schedule: 2019

A ripple was discovered at 6BL1 KP80.6 during planning for a pipe replacement outside and subsequent to EMAT ILI. This section of pipe happen to be located under the road and would not pass the loading assessment due to metal loss/corrosion features. OMH was asked by Enbridge to assist in replacing 80m of pipeline.

The scope consisted of:

  • Pipe hauling, bending, removal and replacement of NPS 30” pipe.
  • Mobilization to site.
  • Pre-tie-in excavation and NDE.
  • Pipe bending and subsequent delivery.
  • Welding at site, including hydrotest preparation.
  • Cut-out activities.
  • Demobilization.