CS6A Station – Phase 1 & 2
Facility Recoat & Replacement

150 Mile House, BC 

Client: Enbridge 

Project Value: $21,000,000 

Project Schedule: June 2021 – December 2022 

The CS6A compressor station was scheduled for a below-ground pipe recoat to address issues in the coating conditions noted during a 2003 integrity dig. During Phase 1 all underground piping that could be was recoated. In Phase 2, all below-ground piping that could not be recoated was relocated above ground.  

This project scope included: 

  • Demolition of non-essential buildings and yard piping.
  • Concrete removal and installation.
  • Installation of piling, pipe supports, platforms (including fabrication).
  • Coating inspection, removal and application.
  • Pipe repair & replacement.
  • Installation of all electrical components (including cable trays, junction boxes, cathodic protection, etc.).
  • Excavation & backfill.