Facility Recoat & Replacement
150 Mile House, BC
Client: Enbridge
Project Value: $21,000,000
Project Schedule: June 2021 – December 2022
The CS6A compressor station was scheduled for a below-ground pipe recoat to address issues in the coating conditions noted during a 2003 integrity dig. During Phase 1 all underground piping that could be was recoated. In Phase 2, all below-ground piping that could not be recoated was relocated above ground.
This project scope included:
- Demolition of non-essential buildings and yard piping.
- Concrete removal and installation.
- Installation of piling, pipe supports, platforms (including fabrication).
- Coating inspection, removal and application.
- Pipe repair & replacement.
- Installation of all electrical components (including cable trays, junction boxes, cathodic protection, etc.).
- Excavation & backfill.