Burnaby Tank Farm Secondary Containment Upgrade (Burnaby, BC)

Pipeline Replacement

Client: Trans Mountain

Project Value: $5,300,000.00 

Project Schedule: September – December 2025 

The project scope included:

  • Involved targeted upgrades to the secondary containment system at the Burnaby Terminal.
  • Performed civil construction services that include the installation of a new sub-drain system, reinforced concrete encasements for leak detection and cathodic protection, and related site restoration works.
  • Demolition and removal of certain legacy infrastructure, including existing sump, valve chamber, and related asphalt and drainage materials.
  • A new Motor-Operated Valve (MOV) installed outside the containment dike, along with associated electrical and instrumentation work.
  • Upgraded to the Programmable Logic Controller (PLC) cabinet and commissioned new system.