Pipeline Replacement
Client: Trans Mountain
Project Value: $5,300,000.00
Project Schedule: September – December 2025
The project scope included:
- Involved targeted upgrades to the secondary containment system at the Burnaby Terminal.
- Performed civil construction services that include the installation of a new sub-drain system, reinforced concrete encasements for leak detection and cathodic protection, and related site restoration works.
- Demolition and removal of certain legacy infrastructure, including existing sump, valve chamber, and related asphalt and drainage materials.
- A new Motor-Operated Valve (MOV) installed outside the containment dike, along with associated electrical and instrumentation work.
- Upgraded to the Programmable Logic Controller (PLC) cabinet and commissioned new system.