2024 Integrity Digs From Hope, BC to Pink Mountain, BC

Integrity Digs

Client: Enbridge 

Project Value: $12,000,000 

Project Schedule: May – October 2024 

In 2024 OMH completed over 70 Integrity digs throughout Northern, Central and Southern BC on Enbridge’s Natural Gas Pipelines. 

The scope included:

  • Access – Matting, Bridge Installation, Crossings, Mulching, Clearing etc. 
  • Hotline Excavation.
  • Coating Removal.
  • Abrasive Blasting.  
  • NDE Inspection/Support.  
  • Repair – Steel Sleeve, Composite Wrap, Cut-out. 
  • Replacement.
  • Re-Coat – Plural Component Spray Application, Hand Application (Brush & Roller).
  • Backfill and Reclamation.
  • Many of the excavations completed on our dig programs consist of a variety of technicalities. 
  • Excessive Dewatering due to high water table or close proximity to rivers or creeks (sand-points/large diameter pumps).
  • High volume of rock to be removed from excavation beside and below utilities. (pneumatic jackhammers, rock drills and hydraulic splitters, hydraulic hoe hammers).
  • Trench boxes or shoring requirements.
  • Close proximity to private property and residential areas.